Design Considerations for Fermilab Multi-MW Proton Facility in the DUNE/LBNF era

Jeffrey Eldred, Sergei Nagaitsev, Vladimir Shiltsev, Alexander Valishev, Robert Zwaska, Michael Syphers

Read on arXiv

arXiv
2203.08276
Date
2022-03-15
Frontier
Accelerator Frontier (AF)
Topical groups
Submitted by
Jeffrey Eldred

Abstract

Fermilab has submitted two Snowmass whitepapers on a future 2.4~MW upgrade for DUNE/LBNF featuring a 2 GeV extension of the PIP-II linac and the construction of a new rapid-cycling-synchrotron. This paper summarizes the relationship between these two scenarios, emphasizing the commonalities and tracing the differences to their original design questions. In addition to a high-level summary of the two 2.4~MW upgrade scenarios, there is a brief discussion of staging, beamline capabilities, subsequent upgrades, and relevant R\&D. We are proposing a vigorous program to address various challenges associated with each scenario and to down-select the concept, most suitable to provide proton beams for years to come.